Variable Body safety shower ceiling mounted, exposed pipework - PremiumLine - BR 073 095 / V | B-Safety
B-Safety BR 073 095 / V PremiumLine
Variable ceiling-mounted safety shower arm for body decontamination, featuring exposed piping and ¾" female water connection. The “V” version provides adjustable headroom (360–1610 mm) and installation height, with the lower edge of the shower head positioned at 2200 mm ±100 mm from finished floor level.
Technical Data
- Material: Stainless steel AISI 316
- Finish: Polished
- Operating dynamic pressure: 1.5–3 bar
- Nominal flow rate: 50 l/min
- Flow variants: 75 l/min / 20 GPM and 110 l/min
- Flow regulator: POM
- Shower head: AISI 316, self-draining
Construction and Operation
The ceiling flange includes four mounting holes. All wetted parts, including arm and head, are AISI 316 stainless steel. Exposed piping allows for visual inspection, leak detection, and access for periodic flow testing.
Integrated automatic flow regulator maintains spray pattern within 1.5–3 bar dynamic pressure. For DIN EN 15154-1:2006 compliance, the section between valve and head must be self-draining.
Flow Rate Variants
- BR 073 095 / V: 50 l/min, hazard class I
- BR 073 095 / V75L: 75 l/min / 20 GPM, hazard class II
- BR 073 095 / V110L: 110 l/min, hazard class III
Standards and Accessories
Complies with DIN EN 15154-1:2006, DIN EN 15154-5:2019, ANSI Z358.1-2014, DIN 1988, and DIN EN 1717. Certification numbers: DVGW NW-0417CL0263 (PDF), NW-0416CL0425 (product page); verify certification at procurement. Optional: IP65 flow switch, EX zone 1 & 2 version, 230 V / 50 Hz alarm module.
Applications and Use Cases
- Industrial process areas with chemical exposure risk
- Laboratories and chemical storage zones
- Facilities requiring compliance with safety shower standards
- Suitable for potable and process water
FAQ
- Q: What is the recommended installation height?
A: 2200 mm ±100 mm from floor to lower edge of shower head. - Q: Is the unit suitable for EX zones?
A: EX zone 1 & 2 version available on request. - Q: What maintenance is required?
A: Periodic flow testing and visual inspection for leaks are recommended.
Description
Certification